FORTH PORTS, PORT OF ROSYTH

MANUFACTURE AND SUPPLY OF 2 OFF NEW 15M PASSENGER GANGWAYS

MANUFACTURE AND SUPPLY OF 2 OFF NEW 15M PASSENGER GANGWAYS

HMS “ALBION” / “BULWARK”

LANDING CRAFT RAMP LOAD TEST, HYDRAULICS SET TO WORK

LANDING CRAFT RAMP LOAD TEST, HYDRAULICS SET TO WORK

MANUFACTURE & SUPPLY OF NEW COMPLETE RAMP

MANUFACTURE & SUPPLY OF NEW COMPLETE RAMP

Dublin Port Company

MANUFACTURE & SUPPLY NEW SHEAVE HOUSINGS FOR No5 RO-RO RAMP
BEFORE

BEFORE

AFTER

AFTER

Fabrication, Installation and Commissioning of new Linkspans 6 & 7

 

 

Typical Types of Work Undertaken

Hatch Covers – Inspection, Surveys, Repair and Spares

Hatch Covers - Inspection, Surveys, Repair and Spares

Bulk Carrier Hatch Cover Survey

Bulk Carrier Hatch Cover Survey

Typical Folding Hatch Cover – Hydraulic Repairs

Typical Folding Hatch Cover - Hydraulic Repairs

Typical ‘Double Deck’ Ro-Ro Facility – Rosyth Inspection, Repair and Spares

Typical 'Double Deck' Ro-Ro Facility - Rosyth Inspection, Repair and Spares

Typical Car Decks – Inspection, Repair and Spares

Typical Car Decks - Inspection, Repair and Spares

Typical Bow Visor & Ramp – Inspection, Repair and Spares

Typical Bow Visor & Ramp - Inspection, Repair and Spares

On-Site Supervision – Riga, Latvia

Hatch being lowered into position

Hatch being lowered into position

Hatch Covers repositioned after Inspection and repair

Hatch Covers repositioned after Inspection and repair.

Hatches having hinge pins re-fitted and Hydraulics reconnected

Hatches having hinge pins re-fitted and Hydraulics reconnected.

Watertesting Hatch Cover seals after installation

Watertesting Hatch Cover seals after installation.